2.5 Million barrels of injected waste stream.

Injection of NORM (Naturally Occurring Radioactive Materials) and NOW (Non-hazardous oilfield waste)  into a subsurface reservoir at above fracture gradients can be accomplished if good engineering design and practices are employed. The following simple guidelines must be followed:

  1. Engineering ahead of operations
  2. Reservoir up design mentality
  3. Process control and safety
  4. Reservoir diagnostics/monitoring



SPE 53821:
Large Scale NOW/NORM disposal through slurry waste injection

SPE 56491:
Large scale NORM/NOW disposal through slurry waste injection: Data Analysis and Modeling




BAKERSURAJ INC
(Page 1) | Underground Fracture Injection (UFI) (Page 2) | Cyclic Injection
(Page 3)

Phone: 337 560 5964
Fax: 337 364 1978
Email: [email protected]